The Construction of Infiltration Galleries for Project of Kota Marudu Water Upgrading System.
Works involve are  construction of water storage chamber, excavation of river ground, installation of screen pipe, installation of backwash pipes, installation of gabion in matress and river reinstatement.
Work duration about 90 days with capacity 4 unit excavator and 4 unit heavy duty sludge water pump.